Thomas the Tank Engine Wikia
Advertisement

This is a timeline chronicling the events of the Railway Series, TV Series and the railways:

1806

  • Plateway from Ward Fell to Balladswail built.

1853

  • The Sodor and Mainland Railway is built.

1864

1865

1870

1875

1877

1879

1880

1883

1888

  • Sir Topham Hatt I is born.
  • Albert is rebuilt into a J1 2-4-2 class.

1896

1897

1898

1899

1900

1903

1905

1910

1913

1914

1915

1916

1917

1918

1919

  • Addams is built.

1920

1922

  • Gordon is built and arrives on Sodor.
  • Henry is pre-rebuilt into a LNER Class A3 with a six-wheeled tender and arrives on Sodor.
  • A second bore is cut for the Ballahoo tunnel after Henry stops in the original.
  • Lord Harry is built.

1923

1929

1932

1940

1946

1947

1948

1949

1950

  • Henry is overhauled.
  • Rheneas is overhauled.
  • Falcon and Stuart are sheeted.
  • Henry has a collision with a goods train and is sent to Crewe to be rebuilt into a LMS Stanier Class 5.
  • Fred is built.

1951

1952

1953

1955

1956

  • Sir Topham Hatt I dies.
  • Daisy is built.

1957

1958

1959

1960

1961

1962

1964

1966

1967

1968

  • Oliver, Isabel and Toad are rescued by Douglas and arrive on Sodor.
  • Merlin, Mike and Rex arrive on Sodor.
  • Merlin is renamed "Bert".
  • Bert is rebuilt with a new boiler, long frames, a cab, a six-wheel tender, a cab and two new wheels, making his wheel arrangement 0-8-2.

1969

1984

1987

  • Mavis is involved in a collision with a lorry and Toby has to do her work while she is absent.

1990

1995

1996

1999

  • Cromford is loaned to Barrow Hill Engine Sheds.

2006

2008

  • Cromford returns to Bluebell Railway.
Advertisement